24/12/2024
The PMEC PT ADVANCE 2.0 Post-Tensioning System Applied at Nhat Ha Hotel – Hai Phong
Nhat Ha Hotel (Sun Park) – Hai Phong is one of the continuing projects in 2020 where the client placed their trust in the Phu My Post-Tensioning System. The PMEC system was selected as a reliable solution for quality control in the construction of post-tensioned slabs, reaffirming its reputation as a trusted and efficient post-tensioning technology in the market.
Hai Phong – The City of Red Flamboyant Flowers ❤️❤️❤️
Nhat Ha Hotel (SUN PARK) – Hai Phong is one of the continuing projects in 2020 where the client placed their trust in the Phu My Post-Tensioning System — a reliable solution for ensuring construction quality in post-tensioned slab works.